Wilkes Barre PA VA Medical Center Borlie Mechanical has created a temporary boiler plant to facilitate the demolition of an existing boiler facility with in the hospital. The new space will be expanded to rig and install 3 new Steam 550 Horsepower English Boilers, new deaerators, surge tanks, blowdown receivers, air compressors, ductwork, Make up air units, steam headers, distribution piping, fuel piping, and new Air conditioned control room. To be completed spring 2017.
A similar facility as described above was successfully completed at the Martinsburg WV facility brought on line the spring of 2015.